20. List of Projects
- Boundary walls for Sub stations: Fabrication and installation of boundary walls for 7 sub-station in south and middle of Iraq to TOYOTA and SIEMENS.
- Al-FAW project: from large-scale projects that have been implemented by TTC, where it was the installation of pre-mix mobile Concrete batching plant and to pour concrete, about 14,000 cubic meters Concrete Ready and 24000 meter of precast concrete piles to ALSTOM global company.
- Al-Amara Project: The processing approximately 15,000 cubic meters Ready Concrete addition to pour 15,000 Cable cover, a project to establish the civil works for the power station high pressure (400 kv) and a subsidiary of the global ABB.
- Halfaya Project: Pouring 10,000 cubic meters of pre-mic concrete
- Nasiriyah project: Pouring 80,000 cubic meters of ready concrete.
- Shatt al-Basra Project: about 50,000 meter of precast concrete piles were supplied and driven.
- New Sports City project: the ready concrete for a large part of the initial stages of the project processing.
Supply and Driven Precast Piles ( 2014-2021)
Project Code | Name of the Project | Qyt ( m) | Client | Location | Year |
TTC-P/01/21 | Supply and driven piles (28.5 x28.5 cm) –Batha and Chybaysh SS | 11,000 | Matelec Group/ Snafee Co. / Ministry of Electricity | Nasriyah | 2021 |
TTC-P/01/21 | Supply and driven piles (28.5 x28.5 cm) –Halfahya Oil Field | 17,850 | PetroChina / PEG/ Noor Baghdad Co. / Ministry of Oil | Maysan | 2021 |
TTC-P/02/20 | Supply and driven piles (28.5 x28.5 cm) –Boob AL-Sham SS | 10,800 | ABB/ MUE Group / Ministry of Electricity | Baghdad | 2020 |
TTC-P/01/20 | Supply and driven piles (28.5 x28.5 cm) – Al-Seba | 600 | Basra Gov. | AL-Seba- Basra | 2020 |
TTC-P/01/19 | Pilling works – Shat El-Arab Substation Supply and driven piles(28.5×28.5 cm ) | 58,050 | ELSEWEDY POWER SYSTEM / Ministry of Electricity | Shat El-Arab – Basra | 2019 |
TTC-P/02/17 | Supply and driven piles (28.5 x28.5 cm) | 5,120 | The Arab Contractors
| Hartha – Basra | 2017 |
TTC-P/01/17 | Supply and driven piles (28.5 x28.5 cm) – AL-Fayhaa substation | 2,160 | Electricity Transport Directorate – South / Ministry of Electricity | Basra | 2017 |
TTC-P/01/16 | Supply and driven piles (28.5 x28.5 cm) – AL-Sharesh sewage treatment plant | 5,143 | Basra Sewage Directorate | AL-Quran Basra | 2016 |
TTC-P/02/15 | Supply and driven piles ( 35x35cm) | 33,000 | RAFIDAIN OIL SERVICES CO. / Ministry of Electricity | AL-Faw – Basra | 2015 |
TTC-P/01/15 | Supply and driven piles (28.5 x28.5 cm) | 36,432 | Shams Al lraq Co. | Nasiriya | 2015 |
TTC-P/04/14 | Supply and driven piles ( 35x35cm) at | 3,168 | Bambosh India | Safwan – Basra | 2014 |
TTC-P/03/14 | Supply and driven piles (28.5 x28.5 cm) | 48,000 | Salam Beladna Co. | Najaf | 2014 |
TTC-P/02/14 | Supply and driven piles (28.5 x28.5 cm)- AL-Faw Sub station | 23,940 | ALSTOM / Ministry of Electricity | AL-Faw – Basra | 2014 |
TTC-P/01/14 | Supply piles (28.5×28.5 cm ) at AL-Fayhaa area | 7,200 | AL-Remah UAE company | Basra | 2014 |
Supply and install Boundary wall
Project Code | Name of the Project | Qyt ( m) | Client | Location | Year |
TTC-P/01/21 | Supply and Install Boundary walls –Batha, Chybaysh and Najaf SS | 900 | Matelec Group/ Snafee Co. / Ministry of Electricity | Nasriyah | 2021 |
TTC-P/02/15 | Supply and Install Boundary walls –AL-Kefil and Abo Karaq SS | 500 | SIEMENS / AL-Sami Co. / Ministry of Electricity– South | Babel | 2021 |
TTC-P/01/19 | Supply and Install Boundary wall – Babel 400/132 SS | 1200 | TOYOTA / ELSEWEDY POWER SYSTEM / Ministry of Electricity | Babel | 2020 |
TTC-P/01/17 | Supply and Install Boundary walls –Mahad, Matar and Madena SS | 810 | SIEMENS / ARCHES Group / Ministry of Electricity– South | Basra | 2020 |
TTC-P/01/16 | Supply and Install Boundary walls –AL-Bteraa SS | 295 | SIEMENS / Quoat al-Sultan Co./ Ministry of Electricity– South | Maysan | 2020 |